| Feature |
This is a Turnkey Project, all related constuctions of this Plant were included. The major content as follow:
1. Construction Detail Design
2. Application for Construction license (obtained by 2004/01/04)
3. Civil works (Include Raw Water Modulate Tank, Quick Mix Tank, Blanket Clarifier Tank, Flash mixer Tank, Precipitate Tank, Rapid sand filtration Tank, Fresh Water Tank etc.)
4. Pipeline Construction (Include all united area pipelines and transfer pipelines)
5. Mechanical & Electrical Construction (Include all machinery, instrumentS, monitor facility and electrical cabling also the test after construction finishes etc.)
|